Jump to content

Pinnacle Bank Arena


49r

Recommended Posts

  • 2 weeks later...

Just a reminder, for those who live in town open practice is this Thursday:

 

 

http://www.huskers.com/ViewArticle.dbml?DB_OEM_ID=100&ATCLID=210437989

 

Nebraska Basketball Live Schedule

5:30 p.m.

Doors Open

Arena Floor Schedule

 

5:30-6:30 p.m.

MBB Practice

6:40 p.m.

Women’s team introductions

6:50 p.m.

Men’s team Introductions

7-7:30 p.m.

MBB/WBB/Fan Skills Contest

Concourse Schedule

 

5:30-6:30 p.m.

WBB Autographs (North Concourse)

5:30-6:30 p.m.

Trick or Treat with Husker Student-Athletes (Main Concourse)

7:30-8 p.m.

MBB Autographs (North Concourse)

Link to comment
Share on other sites

  • 2 weeks later...

Breslin Center slated to undergo $50M upgrade - The Detroit News

 

http://www.detroitnews.com/story/sports/2015/10/30/breslin-center-slated-undergo-50m-upgrade/74869170/

 

635818030653857828-2015-0904-HOH-FINAL-r

 

At the project's center is the construction of a 26,000-square-foot addition that will house the MSU Basketball Hall of History. Located on the southeast side of the Breslin Center, the hall will highlight team and individual accomplishments of the men's and women's basketball programs.

 

Below will be the Draymond Green Strength and Conditioning Center, as well as a locker room for former MSU student-athletes. Green, who plays for the Golden State Warriors, played at Michigan State through 2011. He recently donated $3.1 million to the basketball program, part of which will go toward the $20 million being provided by the athletic department.

 

The renovation will also include expanding and improving concession areas and concourses; improving bathroom facilities; upgrading passenger and freight elevators; and improving exterior entrances and parking lots.

Link to comment
Share on other sites

  • 8 months later...

 

...meanwhile, back in Nebraska:

 

 

57816fa703ddf.image.jpg

 

Story about the manufacturing of the steel sculpture:

 

http://www.omaha.com/metro/steel-sculpture-destined-for-lincoln-s-arena-takes-shape-piece/article_c8155a60-1435-5759-9138-090732afe82c.html

 

57816fae489bc.image.jpg?resize=1200%2C11

 

 

Warning: Although Auroran used the correct link, the WH takes you to their main page. Go to the bottom to click on the link. O

Better yet, use the below link, as the WH appears to have fixed it.

 

http://www.omaha.com/news/metro/steel-sculpture-destined-for-lincoln-s-arena-takes-shape-piece/article_c8155a60-1435-5759-9138-090732afe82c.html

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...